Development of Cooling Towers as Non-Traditional Collectors of Particles, Biological Agents: Concentration, and Detection CX(s) Applied: B3.6 Date: 02/14/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Install a New Colorimeter on the NK-1/3 Raffinate Line CX(s) Applied: B2.2 Date: 02/09/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Conditioning Cane Fiberboard Samples CX(s) Applied: B3.6 Date: 02/09/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Fabrication of Alloys With Trace Depleted Uranium in 1750 C Tube Furnace With Argon Cover in D-0142 CX(s) Applied: B3.6 Date: 02/09/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Titanates for Optimized Performance in Separations Science, Innovative Medical Applications and Photochemistry CX(s) Applied: B3.6 Date: 02/08/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Replace the Roof on Building 235-F CX(s) Applied: B1.3 Date: 02/07/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Retention Basin Cover & Liner System Removal From Service CX(s) Applied: B1.28 Date: 02/07/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Electrochemical Fluorination in Molten Fluoride Salts CX(s) Applied: B3.6 Date: 02/07/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Sampling of Legacy Material for Material, Control & Accountability (MC&A) Verification CX(s) Applied: B3.6 Date: 02/07/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Grout Formulation & Variability Testing CX(s) Applied: B3.6 Date: 02/07/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office