Categorical Exclusion Determinations: Savannah River Operations Office

Heating Actinide Materials in a 2.9 volume % Hydrogen Atmosphere Using a Laboratory Furnace in the C-155 Glovebox CX(s) Applied: B3.6 Date: 04/18/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Installation of Stairs and Sampling Station for Storm Water Outfall G-10A CX(s) Applied: B3.1 Date: 04/12/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Replace Power Supply poles for Savannah River National Laboratory trailer CX(s) Applied: B2.5 Date: 04/10/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Groundwater Monitoring Well Abandonment and Installation at the Mixed Waste Management Facility CX(s) Applied: B3.1 Date: 04/09/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Paint Disturbance and/or Removal Activities in Spent Fuel Project Facilities CX(s) Applied: B1.3 Date: 04/09/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Evaluation of Sorbent/Ion Exchangers for Radiochemical and Metal Separations CX(s) Applied: B3.6 Date: 04/09/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Utility Pole Treatment within the Savannah River National Laboratory Technical Area CX(s) Applied: B1.3 Date: 03/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office