Categorical Exclusion Determinations: Savannah River Operations Office

Subcontractor Repair of Roof Leaks above Cubicles 139/144 in 705-K CX(s) Applied: B1.3 Date: 08/13/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Operation of Zeiss Sigma Variable Pressure Scanning Electron Microscope CX(s) Applied: B3.6 Date: 08/13/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Groundwater Characterization and Well Installation at the P-Area Reactor-Groundwater Operable Unit CX(s) Applied: B3.1 Date: 08/13/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office