Remove Roof Over the North-east Spill Basin 235-F CX(s) Applied: B1.23 Date: 06/18/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Decommissioning and Demolition (D&D) of 681-11N CX(s) Applied: B1.23 Date: 06/18/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Relocate Handi-House SRS-PB-01318 and Six Sealands from A-Area to N-Area Excess Area CX(s) Applied: B1.22 Date: 06/07/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Surface Water and Groundwater Sampling Pen Branch Floodplain near Chemicals Metals and Pesticides Pits CX(s) Applied: B3.1 Date: 06/07/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Dismantlement and Removal of 321-M Solvent Storage Tank Area Dynamic Underground Stripping (DUS I) Remnants CX(s) Applied: B3.1 Date: 06/04/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Sampling of Soil Vapor Extraction Wells at the Western Sector Dynamic Underground Stripping System CX(s) Applied: B3.1 Date: 06/04/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Vegetative Response to Metal Exposure in a Growing Media CX(s) Applied: B3.6 Date: 05/31/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Install Two Pre-engineered Canopies CX(s) Applied: B1.15 Date: 05/30/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Establish Laydown Yard Northeast of MOX Services Concrete Batch Plant CX(s) Applied: B1.15 Date: 05/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Construction of a Metal Carport Structure CX(s) Applied: B1.15 Date: 05/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office