Technetium Precipitation Batch Testing CX(s) Applied: B3.6 Date: 10/31/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Preparation and Temperature-Time Settling Treatment of Rheology Samples CX(s) Applied: B3.6 Date: 10/25/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Bronze Preparation for Zinc Sequestration CX(s) Applied: B3.6 Date: 10/18/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Removal of Out-of-Service Steam Line Segment; D-Area to Ameresco Biomass Cogeneration Facility CX(s) Applied: B1.23 Date: 10/17/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Place Rock Around Storm Water Drop Point to Help Prevent Debris from Entering Storm Water System CX(s) Applied: B1.3 Date: 08/30/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Install a 40 Foot X 40 Foot Butler-type Building and Ten Portable Craft Crew Shacks CX(s) Applied: B1.15 Date: 08/30/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Monosodium Titanate (MST) Rheology CX(s) Applied: B3.6 Date: 08/30/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Cooling Tower Water Sampling and Analysis for Legionella Pneumophila Density CX(s) Applied: B3.6 Date: 08/30/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Dismantle/Remove Vacuum System and Related Equipment in 772-F CX(s) Applied: B1.3 Date: 08/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
284-H Track Coal Hopper Pit Modifications CX(s) Applied: B1.28 Date: 08/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office