Subcontractor Will Provide Roof Repairs at 238-H CX(s) Applied: B1.3Date: 12/04/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Moisture Retention Testing of Saltstone Grouts, Cementitious Samples, Soil Samples, and Sediment Samples CX(s) Applied: B3.6Date: 12/04/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Reroute 221-S Gas Chromatograph Common Return Line per J-DCF-S-03003 CX(s) Applied: B1.3Date: 12/04/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Disposition of Empty Compressed Gas Cylinders Containing Instrument Calibration Gas CX(s) Applied: B1.3Date: 12/03/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Dissolution Thorium Metal with Evaluation of Gas Generation and Evaluation for the Neutralization of Sodium Reactor Experiment (SRE) Fuel Simulant CX(s) Applied: B3.6Date: 12/02/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Motor Silencer Installation CX(s) Applied: B1.21Date: 12/02/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Remove Flammable Gas Monitor CX(s) Applied: B1.3Date: 12/02/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Development for Hydrogen Storage and Neutron Conversion Materials in 999-2W CX(s) Applied: B3.6Date: 12/02/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
The Fixed Length Transfer Jet in Tank 47 Will Be Removed and Used to Fabricate a New Spare Fixed Length Transfer Jet CX(s) Applied: B1.3Date: 12/02/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks 108-1K CX(s) Applied: B1.3 Date: 05/13/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office