Control of Algae at the 281-8H Basin CX(s) Applied: B1.6Date: 12/10/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Cast Stone Testing Using Tank 50 CX(s) Applied: B3.6Date: 12/10/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Canada Target Residue Material (CANTRM) Mock-up and Test CX(s) Applied: B3.6Date: 12/09/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Testing Soils/Sediments for "Available Reducing Capacity" CX(s) Applied: B3.6Date: 12/09/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Roof Repairs at 773-A, E-114 CX(s) Applied: B1.3Date: 12/09/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Plant Accumulators Study CX(s) Applied: B3.6Date: 12/08/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Strippable Coatings CX(s) Applied: B3.6Date: 12/08/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Characterization of SRS Tank Farm Liquid, Salt cake, and Dilute Slurry Samples CX(s) Applied: B3.6Date: 12/08/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
702-2A Heating, Ventilation, and Air Conditioning (HVAC) Installation CX(s) Applied: B1.3Date: 12/08/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Basin Modifications to Receive Research Fuel CX(s) Applied: B2.5Date: 12/08/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office