Temporary Removal of the Tank 12 Purge Exhaust Reheater via HTF-TMC-13-028 CX(s) Applied: B1.3 Date: 07/23/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
300 square feet of Modified Bitumen Roof Repair CX(s) Applied: B1.3 Date: 07/23/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Characterization of Methanotrophs at the Old Integrated Demonstration Site, M Area CX(s) Applied: B3.1 Date: 07/23/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
906-T Air Stripper Dismantle and Removal CX(s) Applied: B1.23 Date: 07/18/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
792-A Sidewalk Installation CX(s) Applied: B1.13 Date: 07/18/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Component Development and Testing for Electrolytic Cells CX(s) Applied: B3.6 Date: 07/16/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Development for Hydrogen Storage and Neutron Conversion Materials, Lab 152 CX(s) Applied: B3.6 Date: 07/16/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Demolition of the 745-N Excess Equipment Pad CX(s) Applied: B1.23 Date: 07/16/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Replace 735-A South Header Ductwork Located on D-wing Service Floor CX(s) Applied: B2.3 Date: 07/16/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Repair Roof at 192-2K CX(s) Applied: B1.3 Date: 07/11/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office