Characterization and Analyses of Core Samples From 105-C Disassembly Basin CX(s) Applied: B3.6 Date: 01/30/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Methane Reforming CX(s) Applied: B3.6 Date: 01/30/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 245-10F CX(s) Applied: B1.3 Date: 01/27/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
685-G PAR Pond and 686-G L-Lake Sluice Gate Conduit Cleanouts/Inspections CX(s) Applied: B1.3 Date: 01/27/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Replace Fiber Optic Receivers/Transmitters, etc. on S&S Systems CX(s) Applied: B1.7 Date: 01/27/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Synthesis of Inorganic Materials Using a Microwave Reactor CX(s) Applied: B3.6 Date: 01/27/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Laboratory Kd Measurements of Non-contaminated Solids and Rad Spiked Solutions CX(s) Applied: B3.6 Date: 01/27/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Alternative Reductant Melter Evaluation Using the Cold Cap Evaluation Furnace (CEF) CX(s) Applied: B3.6 Date: 01/27/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Use of an Existing Quonset Hut for Storage of MOX Construction Materials CX(s) Applied: B1.15Date: 01/14/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
100 Area Fire Station Domestic Well House and Piping Modifications (905-126G) CX(s) Applied: B1.3 Date: 01/13/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office