Subcontractor Repair of Roof Leaks at 707-7F CX(s) Applied: B1.3 Date: 09/09/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Receipt, Unloading, and Movement of Radioactive Samples in Support of the 3013 Pu Surveillance Program CX(s) Applied: B3.6 Date: 09/09/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 776-6A CX(s) Applied: B1.3 Date: 09/09/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 735-A CX(s) Applied: B1.3 Date: 09/09/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 773-43A CX(s) Applied: B1.3 Date: 09/09/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Modular Caustic Side Solvent Extraction (MCU) Improved Solvent Testing CX(s) Applied: B3.6 Date: 09/09/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof at 722-5A CX(s) Applied: B1.3 Date: 09/05/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 705-C CX(s) Applied: B1.3 Date: 09/05/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof at 704-1N CX(s) Applied: B1.3 Date: 09/03/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Extraction-Scrub-Strip Testing with Modular Caustic Side Solvent Extraction Unit Solvents CX(s) Applied: B3.6 Date: 08/29/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office