Establish Digital Density Meter Analytical Capability in 735-A, D-wing CX(s) Applied: B3.6Date: 03/30/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Install a Metal Awning at 703-1B Over Entrance to Telecom Facilities CX(s) Applied: B1.3Date: 03/25/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Install a Metal Awning at 702-1C Over Entrance to Telecom Facilities CX(s) Applied: B1.3Date: 03/25/2015Location(s): South CarolinaOffices(s): Savannah River Operations Office
Install a Metal Awning at 702-2A Over Entrance to Telecom Facilities CX(s) Applied: B1.3Date: 03/25/2015Location(s): South CarolinaOffices(s): Savannah River Operations Office
Roof repairs at 773-A, D-1122 CX(s) Applied: B1.3Date: 03/25/2015Location(s): South CarolinaOffices(s): Savannah River Operations Office
Provide a Rated Wall for HB-Line Stairwell #2, Storage Room and Fire Door CX(s) Applied: B2.5Date: 03/25/2015Location(s): South CarolinaOffices(s): Savannah River Operations Office
Tank 50 Quarterly Sample Characterization CX(s) Applied: B3.6Date: 03/24/2015Location(s): South CarolinaOffices(s): Savannah River Operations Office
Providing Tie-in Features for Addition of Pu Metal Feed Capability in the Mixed Oxide Fuel Fabrication Facility CX(s) Applied: B1.3, A9Date: 03/24/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Transport, Receipt, and Unloading of Samples from VC Summer CX(s) Applied: B3.6Date: 03/24/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Post Load Leak Test for 9975, 9977, or 9978 Containment Vessel Using TM Electronics Solution Model S1A-L2-V Leak Tester CX(s) Applied: B3.6Date: 03/24/2015Location(s): South CarolinaOffices(s): Savannah River Operations Office