Install New Electric Gate and Controls at Building 645-1N CX(s) Applied: B1.3Date: 08/24/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
August 24, 2016Install New Electric Gate and Controls at Building 645-1N
CX(s) Applied: B1.3
Date: 08/24/2016
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Project involves installation of new electrically-operated vehicle gate and associated controls and concrete equipment pads at the entrance to the 645-N building complex.