CX-015863: Categorical Exclusion Determination

Install New Electric Gate and Controls at Building 645-1N CX(s) Applied: B1.3Date: 08/24/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office

Office of NEPA Policy and Compliance

August 24, 2016
Estimated Read Time   min

Install New Electric Gate and Controls at Building 645-1N
CX(s) Applied: B1.3
Date: 08/24/2016
Location(s): South Carolina
Offices(s): Savannah River Operations Office

Project involves installation of new electrically-operated vehicle gate and associated controls and concrete equipment pads at the entrance to the 645-N building complex.

Document(s) Available for Download