Subcontractor Repair of Roof Leaks at 742-A CX(s) Applied: B1.3 Date: 12/09/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Office Trailer Relocation CX(s) Applied: B1.22 Date: 12/09/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 704-55H CX(s) Applied: B1.3 Date: 12/09/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Tank Farm and DWPF Sample Analysis CX(s) Applied: B3.6 Date: 12/09/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Replace Exhaust Fan in 105-L CX(s) Applied: B1.3 Date: 12/05/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Antifoam Degradation Testing CX(s) Applied: B3.6 Date: 12/05/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Uninterrupted Power Supply Replacement for Certain Safeguards and Security Systems in K-Area Complex CX(s) Applied: B1.7 Date: 12/02/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Characterization of SCO Sludge, Supernate, and Glass for Tank Farm Return CX(s) Applied: B3.6 Date: 12/02/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Glass Formulation, Testing, and Characterization CX(s) Applied: B3.6 Date: 12/02/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Digestion analysis of copper foil and silicon carbide samples CX(s) Applied: B3.6 Date: 11/26/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office