Gas Chromatographic Analysis of Samples for VOC's - Labs 135, 123 and 118 of 735-11A CX(s) Applied: B3.6Date: 05/04/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Electrochemical Polishing for Passivation of Materials CX(s) Applied: B3.6Date: 05/04/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Repair Two Damaged Wells FCB002CR FCB002DR CX(s) Applied: B3.1Date: 04/30/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Design and Installation of Gas Cabinet for Gas Cylinder Storage in K Area CX(s) Applied: B2.3Date: 04/30/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Security Upgrades for 773-41A per U-MT-A-00016 CX(s) Applied: B1.15Date: 04/30/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Dismantle and Remove Abandoned 773-A D-Wing Roof HVAC Equipment CX(s) Applied: B1.3Date: 04/30/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 703-B, A-79 CX(s) Applied: B1.3Date: 04/29/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Convert 15 ABRP Wells From the Active SVE System to Microblower Baroball SVE and Convert Two Dry A-Area Groundwater Monitoring Wells to SVE Operation CX(s) Applied: B6.9Date: 04/29/2015 Location(s): South CarolinaOffices(s): Savannah River Operations O...
Communication Line Installation Between 245-15F and a Temporary Shed CX(s) Applied: B1.7Date: 04/28/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Clear Debris and Fallen Timber From Rows at the Sanitary Sludge Application Site CX(s) Applied: B1.3Date: 04/27/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office