C-Area Trailer Demolition and Removal CX(s) Applied: B1.23Date: 06/23/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Simulant Studies for Hanford Recycle Solutions CX(s) Applied: B3.6Date: 06/23/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Operation of a Shielded Bruker AVANCE 300 NMR system CX(s) Applied: B3.6Date: 06/23/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 789-2B CX(s) Applied: B1.3Date: 06/18/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Snohomish-Beverly Park #3 and #4 Line Structure Replacements CX(s) Applied: B1.3Date: 41865 Location(s): WashingtonOffices(s): Bonneville Power Administration
Subcontractor Will Provide Roof Repairs at 717-K CX(s) Applied: B1.3Date: 06/18/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
FBI Shielded Cells Evidentiary Techniques Demonstration CX(s) Applied: B1.2Date: 06/16/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Remove Concrete Piers that Supported the Removed Steam Line CX(s) Applied: B1.23Date: 06/16/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Convert Leak Detection Boxes LDB-1A and LDB-2A at FDB-2 to modified LDB's CX(s) Applied: B1.3Date: 06/16/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Soil Vapor Extraction Well AF-8 Vented to Atmosphere CX(s) Applied: B6.9Date: 06/16/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office