K Area Complex (KAC) Chilled Water System Upgrade CX(s) Applied: B2.1Date: 41829 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at Building 105-L (+34 Near/Farside) CX(s) Applied: B1.3Date: 41829 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Routine Samples from the ARP/MCU System CX(s) Applied: B3.6Date: 41829 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Replacement of the Roof at Building 773-A, Rooms E172 and E174 CX(s) Applied: B1.3Date: 41829 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Replace ETP Reverse Osmosis (RO) Cooling Towers (CTWs) and Add a Chemical Addition System CX(s) Applied: B1.5Date: 41827 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Installation of Portable Executive Restroom Trailer - S-Area CX(s) Applied: B1.15Date: 41827 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Replace 707-C Emergency Diesel Generator (SRO 7850) CX(s) Applied: B1.3Date: 41827 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at Building 705-H, Rooms 28 and 64 CX(s) Applied: B1.3Date: 41827 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Metallurgical Laboratory (Met Lab) Hazardous Waste Management Facility (HWMF) Vadose Zone Remedial Characterization CX(s) Applied: B3.1Date: 41823 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Sorption of Humate onto SRS Sediment CX(s) Applied: B3.6Date: 41820 Location(s): South CarolinaOffices(s): Savannah River Operations Office