Demolition of Outfall Sampling Station CX(s) Applied: B1.23Date: 41844 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Tritium Responsive Infrastructure Modifications CX(s) Applied: B1.15Date: 41844 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Biofuels Production Experiment CX(s) Applied: B3.6Date: 41841 Location(s): South CarolinaOffices(s): Savannah River Operations Office
782-A A-Area Service and Fire Water Storage Tank Coating Repairs CX(s) Applied: B1.3Date: 41841 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Repair Telecom Cabling to H-Area Wind Tower 614-50G CX(s) Applied: B1.3Date: 41837 Location(s): South CarolinaOffices(s): Savannah River Operations Office
HB-Line Security Upgrades CX(s) Applied: B1.3Date: 41835 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Fabrication/Maintenance Shop and Environmental Test Activities in the SRNL Nonproliferation Technologies Section Engineering Laboratories CX(s) Applied: B3.6Date: 41835 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Grit Blasting CX(s) Applied: B3.6Date: 41835 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Obtain Samples for Potential D-Area Borrow Sources (Revision 1: Develop Borrow Pit 6 and Haul Roads) CX(s) Applied: B6.1Date: 41835 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Western Sector Characterization Soil Borings and Groundwater Monitoring Well Installation, Phase III CX(s) Applied: B3.1Date: 41829 Location(s): South CarolinaOffices(s): Savannah River Operations Office