Installation of a Concrete Pad East of Building 241-149H CX(s) Applied: B1.15Date: 41807 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Install Condensate Release Valves on 108-1K Compressed Air System CX(s) Applied: B1.3 Date: 04/16/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor to Repair Roof Leaks at 246-H CX(s) Applied: B1.3Date: 41801 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Repair/Reseals Concrete and Asphalt Covers at R- Reactor Seepage Basin CX(s) Applied: B1.3Date: 41801 Location(s): South CarolinaOffices(s): Savannah River Operations Office
DWPF Recycle Collection Tank (RCT) Sample Analysis and Foaming Study CX(s) Applied: B3.6Date: 41799 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Filter Enhancement Tests in 786-A with Salt Simulant CX(s) Applied: B3.6Date: 41800 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Increase MicroBlower Size at the 321-M Solvent Storage Tank Area (SSTA) Dynamic Underground Stripping (DUS I) Remediation Site CX(s) Applied: B6.1Date: 41800 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 722-5A CX(s) Applied: B1.3Date: 41800 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Replace roofing system at 702-F CX(s) Applied: B1.3Date: 41799 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Replace 730-2B Roof CX(s) Applied: B1.3Date: 41799 Location(s): South CarolinaOffices(s): Savannah River Operations Office