The Fixed Length Transfer Jet in Tank 47 Will Be Removed and Used to Fabricate a New Spare Fixed Length Transfer Jet CX(s) Applied: B1.3Date: 12/02/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks 108-1K CX(s) Applied: B1.3 Date: 05/13/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Well Installations at R-Area Operable Unit CX(s) Applied: B3.1Date: 41879 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Electrochemical Fluorination in Molten Fluoride Salts and Detection of Fluorinated Species CX(s) Applied: B3.6Date: 41879 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Use of the ASTM G 36-94 Method for the Evaluation of Stress Corrosion Cracking CX(s) Applied: B3.6Date: 41879 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Alternative Chemical Cleaning for Sludge Heel Removal and MCU Oxalate and Aluminate Solubility - Radioactive Testing CX(s) Applied: B3.6Date: 41877 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Electrodepositon of Molybdenum, NickelMolybdenum alloy, Cesium, and Strontium CX(s) Applied: B3.6Date: 41876 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Roof repairs at 773-A, E-004 CX(s) Applied: B1.3Date: 41872 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Seal Access Plugs at 105-C CX(s) Applied: B1.3Date: 41872 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Replace Department of Energy Office Trailers CX(s) Applied: B1.15Date: 41871 Location(s): South CarolinaOffices(s): Savannah River Operations Office