Proposed activity provides for the procurement and installation of a backup set of Dead Weight Testers in the Building 234-H (HAOM) Hot Calibration…
A permanent mount camera is to be installed in the Defense Waste Processing Facility Chemical Processing Facility.…
Eumeca Pumps are Acceptable for direct replacement of Normetex pumps.…
The scope of this task will replace the diesel engine and generator and consolidate and/or replace the existing 4 Motor Control Centers (MCCs) in B…
Design and install a new Digital Imaging and Measurement System (DIMS) to be installed in Room 28 of Building 233-H. It will be installed on a tabl…
Troubleshoot and repair indoor lights at 704-N.…
A pH electrode will be used to determine the pH of solutions. Chloride and Fluoride concentrations will be determined via ion specific electrodes.…
The objective of this study is to better understand the mechanisms of strontium sorption in aquifer sediments.…
Clearing of forested area near 703-B running track.…
Engineering Standard 15888 requires the change of HEPA/pre-filters. Maintenance will perform the seven year PM to change HEPA and prefilters.…