Apply cool seal (Ames Maximum Stretch Coating) to trailer roofs and touch-up interior paint.…
This EEC supports activities post Cold and Dark status of Building 235-F. This revision includes the following proposed activities: deactivation of…
The EEC covers painting of the stairways and exterior doors to 713-1N.…
A hose-in-hose transfer line will be routed from an existing manifold in the Tank 10 Center Riser to Tank 11 Riser 2.…
The activity is to perform up to 6 Seismic Cone Penetrometer Testing (SCPT) and Cone Penetrometer Testing (CPT) for geotechnical evaluation (lithol…
Replacing existing centrifugal switches for the 238-H Exhaust Fan A (53.001-A) with a new speed switch.…
The Tritium Facility desires to execute a project to design and implement physical security upgrades for 234-7H and 246-2H Vault Type Rooms (VTRs) …
Subcontractor will perform repairs to the roof on Bldgs. 773-43A and Bldg. 779-A.…
This activity details the general operation of the FormLabs SLA resin 3D printers (Form2 and Form3 variations) along with the post-processing tasks…
This project is to synthesize nanoscale sodium titanates and then load them with gold ions for the University of Washington. Collaborators at the U…