The activity involves a collaborative effort between SRNL, Buffalo State College (BSC), and Idaho National Laboratory (INL).…
Install Monitoring Well FBG002D for the F-Area Tank Farm Groundwater Monitoring Program to replace FBG001D.…
Disassemble and remove damaged shed beside 702-A.…
Repair Building 264-2H roof.…
741-N Empty and sort 3 Rad C roll off pans.…
Operations in the materials characterization laboratory consists of the following activities: clean particle size analyzer, glass disk apparatus fo…
Slow strain rate testing is a method by which susceptibility of these materials to a range of potential tank chemistries can be evaluated.…
Perform inspection and repair of the Concrete CHEX plenums running North-South under B and C-005 prior to implementation of DSA Rev 2.…
Staining from a potential rain water leak has occurred along the exterior of some cell windows located in F-091.…
Remove old door and frame in 735-A, B-101 and replace with new 90-minute fire door and frame, also replace broken wallboard on north wall in 735-A,…