EEC for Haake rheometers that use NIST traceable oil standards for verifying the functionality of the instruments.…
Damaged floor and tile will be removed and replaced in 704-28E.…
Prep and paint walls in the 704-59E Conference Room.…
Testing is to be performed to evaluate possible pluggage of dip legs used in various tanks on site.…
Study the solid-liquid extraction performance of various inorganic and organic solid materials with simulant solutions, nominally nitrate, sulfate,…
Install two (2) concrete pads for two (2) quonset huts (structure numbers 706-11H and 706-12H) to house craft personnel.…
The 291-F stack isokinetic sampling rake will be cleaned by flushing air through it.…
Gas phase UF6, CO2 and water samples will be condensed on a diamond slide and studied using the Helios femtosecond transient absorption spectromete…
CX-025330: Removal of Trailer 706-7H, Replacement Trailer Installation (706-8H) in H-Tank Farm (HTF)
This EEC serves to cover the removal of trailer 706-7H within HTF.…
This project will provide a new exhaust system (2 Fans), a small electrical building, a stack, and a new diesel generator for 234-7H and will blank…