Repair and-or replace impacted room features following ARGUS installation in 701-1K and 701-2K.…
Replace the door and existing hinges for Door 338 in 105-L.…
Mitigate contamination migration on the RBOF Cask Pad.…
The Level Transmitter is being changed to a contactless radar.…
Remove flanged spool piece and replace with ball valve on the TRU Pad 6 sump recirculation piping system.…
The purpose of this EEC is to document the placement of a grout plug into the 6 in abandoned process sewer drain pipe riser to prevent additional i…
Four Handi-Houses located in the K-Protected Area (2) and Limited Area (2) are to be staged outside of K-Area and delivered to SRSCRO.…
This activity covers the tasks of receiving 7A or Croft SafDrums containing nuclear material from the K-Area Complex, unloading the shipping contai…
Graphite will be mixed with simulants of fission products and heavy metals.…
The gas chromatographs will be used to measure the composition of gases from laboratory experiments at 999-1W.…