The current battery bank in 251-F Substation will be removed and replaced with new batteries of the same type.…
Replace all windows at building 719-H per SOW.…
The Arcam A2X additive manufacturing machine produces complex metal parts from 3D computer aided design (CAD) models via electron beam melting.…
The Zeiss Sigma VP scanning electron microscope (SEM) is used to examine solids for imaging and elemental analysis.…
Install a Larger Air Receiving Tank (about 5000 gallons) for the CPC Purge Air Compressors at 422-S.…
Subcontractor will perform a core sampling of roofs Buildings 232-H, 264-H, and 264-2H with SRS asbestos group.…
Remove damaged asbestos insulation from the two HVAC ductwork located on the West side of 773-A F-wing Lower Roof.…
The outdoor Motor Control Center (MCC) requires replacement due to age and cost and availability of replacement parts.…
Installation of Insulation on Saltstone Salt Solution Receipt Tank Process Vessel Vent System Exhaust…
Remove paint from 2 in. carbon steel pipe 25 lb. oxygen header located in D-0101 (Glass Shop) per Work Order 1913362 to prepare pipe for Lockring c…