Removal of asbestos insulation needed to repair steam leak at 218-H…
Add an additional portable BA header to run a second portable BA system simultaneously to support additional users at one time.…
613-7A Parking lot seal and restripe.…
This EEC covers analytical methods for Radiochemical Measurements. This revision includes new chemical being added.…
Paint 905-108H MCC and replace structure sign.…
Floor tiles and metal cabinets will be replaced in lab 210 at the SREL main laboratory building, 737-A.…
Temporary Modification (234H-TMC-22-333) to route HAOM Inert Compressor to process sewer drain leading to H-2 Outfall.…
Due to high OCN rates over several years of operation, replace the existing Room 41 GS Oxygen Monitor (MSA Toxgard model 485950) with a new device …
Move 16.3, 18.3, PVV Controls from 17.2E Evaporator PLC to DCS at H-Canyon.…
The installation of a new guardrail system will provide fall protection from the edge of the roof for workers in the area or those passing by.…