The scope of this work is to perform single and multi-step synthesis for the development of materials pertaining to photovoltaic devices such as el…
Install two doors and build walls to hold the doors.…
Southern Sector airlift recirculation wells SSR-002 to SSR-012 to be placed out-of-commission in preparation for future abandonment.…
Two monitoring wells (CRW029C and CRW030C) will be installed via RotoSonic drilling within the two bio-barriers (emulsified oil and microbial suppl…
Deploy new training training trailers and restroom trailer near existing S-Area Training Campus at 704-49S (S-Area West and West of 250-S).…
Modify Entrance Gate between 703-46A and 703-41A.…
Replace 736-A HVAC per E-SOW-A-00138 and M-SOW-A-00189.…
Add redundant HVAC system in building 623-40G.…
The DCP outlines some caustic delivery improvements to 221-H through piping modifications and re-purposing.…
Painted striping in areas in H-Canyon for repainting or encapsulation.…