The Hot and Cold Nitrogen (HCN) System Pressure Relief Valves (PRVs) are replaced every 48 months per Preventive Maintenance (PM) Work Orders.…
Establish Digital Density meter analytical capability in 735-A, D-wing.…
Analysis of water samples using liquid scintillation spectrometry.…
This ongoing activity is to provide high sensitivity analyses of samples from on and off site locations.…
This activity will evaluate the chemistry and engineering aspects of a process for stripping chloride from nitric acid solutions using heat, gas sp…
Replace fuel oil heater No. 45 in building 717-3N and abandon in place existing unit No. 47.…
Due to constraints on parking spaces in the original ETP parking lot, overflow parking needs to be established.…
Relocation of Handi House from the west side of TRU Pad 26 to the Back 40 Area of the Burial Ground…
N Area exterior renovations to rinse, seal, and paint exterior walls on buildings as listed in the detailed descripition.…
Perform planned maintenance/renovations on the interior walls, floors, windows and doors of buildings 711-N, 711-2N,