The first step in the dismantlement process is to isolate the six recovery wells (i.e., RWM-12, RWM-13B, RWM-13C, RWM-14B, RWM-14C, and RWM-15B) th…
Replace MPC Crane High Pressure Sodium (HPS) Light with LED Lights.…
Identify the location of the caustic line leak at 211-H and perform necessary repairs.…
714-2N Replace carpet and paint.…
Fill two (2) MDB Doors for SRPPF with concrete and expandable foam at Central Shops.…
This proposed activity includes the installation of a new SAS storage bed and replacing the existing Carbon Steel Nitrogen Exhaust Line for the SAS…
Design, fabricate, and place into service new disposable waste containers capable of being connected to a glovebox at the transfer container airloc…
Reconfigures Loading Line 6 (LL6) to improve loading efficiency…
The Building 233-H Special Container Loading/Unloading (SCLU) Stripper Valve Replacement outage consists of the following activities: 1. Replace th…
Isolation and removal of OKUMA LU15 CNC Twin-turret lathe (DOE 008067) from Building 226-2F to SRSCRO.…