Enhancements to be done in 704-K via removal of wallpaper from certain building hallways/corridors where needed, and applying paint, etc.…
Subcontractor will provide roof repairs to K-Area 918 Fan.…
Additional FEDNET Communications Data Drops will be installed in 105-K.…
Upgrade fire detection and alarm system in Building 704-K.…
Remove the south rail stop from the 105-L transfer bay area.…
Seal the near side handball court, 191-L access plugs and entry hatch cover to prevent water intrusion into the building.…
Remove and replace insulation on steam lines in L-Area.…
A new wireless remote Start/Stop will be installed at M-Area Recovery Wells (RWMs) 2, 3, 4, 5, 6, 7, 8, 10, and 18.…
Three soil borings will be strategically advanced to a depth of 240 feet at the M-Area Hazardous Waste Management Facility: Western Sector In-Situ…
Emulsified zero valent iron (EZVI) will be injected into the subsurface using six fracture/injection points northwest of the M-Area Settling Basin.…