Safety items in H area (outdoors) will be repainted due to fading due to sun exposure.…
Subcontractor to patch the asphalt that was damaged located directly outside the 980-S Loading Dock and 704-S.…
This project will evaluate materials for anhydrous Hydrogen Chloride (HCl) and anhydrous Hydrogen Fluoride (HF) removal from hydrogen streams.…
Repaint floor areas over fixed contamination in 105-L.…
Periodically, Regulatory Monitoring and Bioassay Lab personnel need to relocate P10 gas service panels from one room or lab to another.…
This activity is being performed in response to a request by Savannah River Remediation (SRR) to perform testing and modeling designed to understan…
The proposed solution addresses the requirements for the design, installation, and performance testing of replacing Diffuser (DI) System DE Vessel …
New office trailers are to be installed in G-Area to support Savannah River Remediation personnel.…
A Process Air pressure reducing station to operate pneumatic tools will be installed in the Saltstone Facility Process Room.…
The Saltstone Facility Bulk Material Handling (BMH) system is experiencing issues with the butterfly and knife gate valves.…