Environmental Sciences and Biotechnology Group will evaluate the impact of a group of microorganisms on the physical properties of tar sands contai…
Environmental Sciences and Biotechnology Group will evaluate the impact of a group of microorganisms on the bioremediation of petroleum contaminate…
Work instructions are to safely install, setup, and anchor the new Bridgeport Milling Machine and accessories in 717-F.…
Occasionally, the vacuum lines in the 735-B hood systems need to be repaired with new lines due to normal wear and tear.…
Legacy asbestos waste in D-Area will be repackaged and transported for proper disposal.…
TCAP Column A, along with TCAP Feed Beds A and B and TCAP Product Bed B and TCAP Deuterium Beds A and B are to be replaced in-kind by new component…
The existing gravel road around the E-Area Trailer Complex will be paved.…
717-F Annex renovations.…
The obsolete recloser on H3B feeder is reaching the end of its life cycle and should be replaced.…
Install new equipment (HVAC unit and Ice maker) at 725-1N.…