This proposed activity will remove roofing on top of H Canyon and install a water-proofing system and new gutter liner.…
This activity will upgrades the electrical system at the 901-H Segregation Cooling Water Valve Pit.…
Access to Steel Creek to perform routine long-term sampling of surface water and shallow monitoring wells is not easily accessible.…
This EEC covers all maintenance work performed by SRNS Organizations on steam lines located at SRS.…
The Slurry Mix Evaporator (SME) “Jog” feature is to be removed from Distributed Control System (DCS) and is to be re-located to the Motor Control C…
Activities to include maintenance of the Corrosion Coupon Test Site within E-Area Low Level Waste Facility, resistance measurements of corrosion co…
Doors in Building 292-2F will be disassembled, lubricated and/or repaired as necessary and reassembled.…
Sputter deposition is a physical vapor deposition method of depositing thin films on substrates.…
US and S will replace the degrading dock shelters at 731-1N.…
Renovation of the 724-50E Bathroom Trailer including several activities for the inside and outside of the trailer.…