Install Public Address (PA) system speakers at 717-10N and 717-3N, 714-2N, 704-1N, 704-3N, 713-N, 645-1N, 645-2N, 710-14N.…
This project involves the replacement of Barricade 9 which will be performed by the US Army Corps of Engineers (USACE).…
Installation of a A Ductless Mini-Split HVAC system to provide supplemental cooling for building 730-A room 167.…
Install (Gardner Denver L22 30HP 460V Cooled 125PSI with AEON90000SP oil and moisture trap rotary screw compressor) in building 717-F Construction …
722-4A Remove asbestos insulation/mastic on the 2 roof drain pipes.…
The project will prepare a Phase I Environmental Site Assessment (ESA) in accordance with applicable EPA regulations and ASTM standards to evaluate…
The Bundle Storage (MTR) Rack is Safety Signifigant Design feature that is located in Section 3 of the Hot Canyon of 221-H. This DCP replaces exisi…
Perform interior and exterior renovations to Trailer 704-10F.…
Paint exterior of 241-125H and install 4 new downspouts.…
This work is for a structural integrity inspection performed every 10 years.…