Install Public Address (PA) system speakers at 717-10N and 717-3N, 714-2N, 704-1N, 704-3N, 713-N, 645-1N, 645-2N, 710-14N.…
Install indoor PA speakers per attached work instructions in 703-B, 703-1B, 716-B, 772-7B, 772-25B, 772-27B, 789-B, 735-1B, 735-4B, 735-B, 703-5B, …
This activity involves the installation of external oil sampling ports on various electrical transformers throughout SRS.…
Bag filters will be installed to the cooling water return flush line feeds of the 285-H Cooling Water System's basin for a trial run.…
Maintenance will remove/replace Tank 181 East and West strainer to inspect for blockages and clean.…
This activity will encompass two (2) analytical methods that will be performed in 773-A, B-111: Interfacial Tension (IFT) and Oil/Grease Analysis b…
Scope of activity is Architectural and Electrical installations in Lab C-108/112 Bldg 773-A per WO 1903862.…
This modification will align 9.2E evaporator configuration to 9.1E by placing the 9.2E Vent temperature instrumentation to an Out of Service status…
Rubble Pits 131-1L and 131-4L are to be characterized to determine nature and extent of contamination that may be present in the subsurface as a re…
One access port needs to be drilled into the top of F-Tank Farms 242-3F Concentrate Transfer System (CTS) cell cover to allow flexible hoses into t…