Small radioactive particles will be deposited on planchets using aerosolization.…
The activity consists of making magnetic susceptibility measurements of different samples inside of their containers.…
This EEC covers all low hazard, routine, and repetitive task work activities that can be performed in the Savannah River Mission Completion (SRMC) …
Subcontractor will provide roof replacement on Buildings 713-2N, 713-3N, and 731-2N.…
Conduct repairs to gypsum board credited firewalls in 735-B.…
Install indoor PA speakers per attached work instructions in 730-B, 730-1B, 730-2B, and 730-4B.…
Subcontractor will provide main roof replacement at 151-2C.…
Subcontractor will provide roof repairs over Rooms F-062 and F-162 at Building 773-A, F-wing.…
This activity covers the high-precision titrimetric measurement of Uranium (U) content for a wide variety of samples for which an estimate of the u…
Construction will remove old flooring and install new VCT flooring in rooms F-162, F-138, and F-150 of 773-A as needed.…