Construction will repair rotten subfloor in 786-3A (Trailer) per Work Order 01911360.…
The Process Science Analytical Laboratory (PSAL) provides analytical support for the Process Science and Engineering Department and other SRNL orga…
3D printers will be used to develop parts for Unmanned Aerial Vehicles (UAVs).…
CM 3681: Disconnect Bertsch Plate Roller in 717-1N move it to 717-N iron worker laydown yard for future excess.…
Mini-Thermal Cycling Absorption Process (TCAP) components are to be designed and installed into secondary confinement in TEF, and tied in to TEF Di…
Tritium Extraction Facility (TEF) Open Glovebox Maintenance on GB 3500 to replace GB recirculation blower motors and potential implementation of Te…
Temporary Modification (234H-TMC-22-333) to route HAOM Inert Compressor to process sewer drain leading to H-2 Outfall.…
The MT proposes to design a replacement of the flooring/supports (all) and pipe supports (corroded only) associated with the sanitary lift station.…
Install one duct smoke detector in the common air supply duct downstream from HVAC-AHU-001 (H-234007-HVAC-AHU-001).…
This evaluation covers operation of miniature mixer-settlers and centrifugal contactors used for solvent extraction in 773-A laboratories C-077 and…