Repair Trailers 704-7B and 704-12B.…
Construction is to prep and paint in the H and V room for the floor areas requiring re-painting.…
Repair wood beam in 711-9N.…
This EEC covers the evaluation and corrections of HVAC compressors units in 773-A.…
784-7A vendor to clean various locations in powerhouse.…
SRNL and Engineering Developmental Laboratory (EDL) in particular have been tasked to perform a set of small scale (ESS and 2cm) and fullscale V-5 …
702-A Install Keri door on entry No. 4.…
Construction is to paint the floors in the RRTAL cooldown room, electrical room, and protective clothing room as well as repair/paint the walls in …
Remove existing HVAC Unit No. 3 from building 717-5N and replace with a new 5-ton Carrier heat-pump package unit.…
Construction to excavate soil on west and north sides of 735-A, A-Wing Basement in order to repair existing underground commodity penetrations in t…