Seeds of native plants will be placed in the field and monitored for several years for germination.…
Install new sprinkler heads (or relocate existing ones, if possible) throughout Building 704-71S where missing and adjust existing sprinkler head l…
Replacement of 704-Z Fire Alarm Panel due to it being obsolete.…
A second lead melter (1,000 lb) will be installed and operated at the Complex.…
The proposed modification is to remove two abandoned Kanne Chambers that are Out-of-Service (OOS) in Lab C-061 per M-DCF-A-01422.…
Remove concrete and metal post to a minimum of 2 inches below grade prep area and apply asphalt to restore the area back to its normal configuratio…
In-well sensor will be installed in an existing groundwater piezometer well in the F-Area wetlands. Monitoring will be performed remotely.…
Install indoor PA speakers per attached work instructions in 703-A,784-3A, 784-1A, 703-46A, 703-45A, 723-A, 773-52A, 703-43A, 703-42A, 737-24A, 730…
Installation of electric vehicle charging stations across SRS.…
Install a pressure reducing valve in both Inert Load Lines in accessible locations that allow the operator to monitor delivery gas pressure and loa…