Inspection and treatment of utility/power poles in the F, H and E-BG areas and facilities.…
Repair/Replace roof drain line sections from F-091 to F-150 per WO 1852076 and M-SOW-A-00213.…
Simulants will be prepared for testing at SRS to evaluate the effects of various reagents on groundwater brine chemistry.…
703-42A Install Data (4 Drops) in rooms 147, 148, and 149.…
703-43A Replace carpet and cove base.…
During routine sampling of HP-50 on 03/19/2022 by Savannah River Tritium Enterprise (SRTE), the pH of the effluent was identified as significantly …
Operation of a R and D Vacuum Furnace in Building 723-A. Metal parts will be heat treated or brazed within a vacuum or inert environment within the…
Weapon Production Technology (WPT) group is replacing the legacy inert gas purification system from Vacuum Atmospheres Company (VAC) in Lab C-061 p…
Like for like replacement of A-wing Sump pumps and associated controls and supports.…
Corrosion testing per ASTM standards on stainless steels and corrosion-resistant alloys for intergranular corrosion susceptibility performed on met…