This project seeks to develop a high performance catalyst with significantly improved activity.…
Modify TRU PAD 4 for additional equipment. System will need electrical power and design support.…
Remove and replace fire dampers FD-292-104 and FD-292-115 and their associated penetration seals in Building 292-S.…
Modify the 511-S Steam System to an Out of Commission Configuration.…
Repair 2 leaking roof drain pipes in 722-A.…
784-7A Ceiling insulation repair.…
703-10B Soffit and gable repair, prep, and paint (Dog kennels).…
The storage tank room plugs will be cleaned and resealed.…
There are three [3] locations in the 717-1N Boilermaker Shop where the base plate and lower section of the structural steel column supports have de…
We will be releasing D2O to the atmosphere within the pine forest at SRS and sampling it downwind using Universal Gas Analyzers, bagging air sample…