The Furnace 100 Process Chilled Water has been shown to be overly acidic for its process function and needs to be drained.…
Augusta Industrial will clean up and dispose of bird droppings in SRTE, Building 232-H Truckwell.…
Replace HVAC Heat Pumps and Air Handling Units for Buildings 247-H and 248-H. Existing units are original components and have reached the end of th…
This project will provide a new exhaust system (2 Fans), a small electrical building, a stack, and a new diesel generator for 234-7H and will blank…
TCAP Column B, along with TCAP Product Storage Bed A are to be replaced by new components.…
The scope of this task will replace the diesel engine and generator and consolidate and or replace the existing 4 Motor Control Centers (MCCs) in B…
A concrete pad and pre-fabricated picnic shelter will be erected at the SREL Conference Center.…
Install Pizza Ovens in 766-H.…
Replace walkway (footbridge) at 645-4N.…
Pour new concrete pad at 713-N roll-up door.…