722-5A Paint hallway.…
Subcontractor will provide roof repairs at 703-44A.…
Dominion Energy SC (DESC) will replace the fence around the switchyard at 151-1L.…
This study aims to evaluate the mercury (Hg) and hydrogen gettering and retention abilities of metal catalyzed inorganic substrates, in support of …
The Defense Waste Processing Facility (DWPF) Weld Test Cell camera is to be replaced.…
Radiation monitors that are no longer needed are being removed from service and abandoned in place.…
Installation of blanks between existing flanges downstream of valve 171-7 and 171-8. REV 1 will also cover the cleaning out of the tank by vacuum t…
Maintenance to install a pair of eye bolts on door 410 North for Admin Seal applications.…
Work instructions are to safely install, setup, and anchor the new Bridgeport Milling Machine and accessories in 717-F. Additionally (Rev. 1): Plan…
This EEC covers all flushing, inspections, and maintenance of the fire water systems across the SRS.…