Isolation of the Confinement Heat Removal (CHR) System from the disassembly basin in K-Area. Revision 1 only to extend activity end date.…
This modification will install a security barrier at Building 105-K air handling unit's duct penetration point.…
Mold Coating testing is to determine which mold coating is the best and how much will need to be applied.…
Design and install new stand-alone permissive circuits for Safety Significant (SS) portions of the door scheme along with all the remaining permiss…
Scope-Clean oil spill in 715-3N fuel dike and repair pressure control device.…
Activation of molecular sieve adsorbents by flushing helium through the adsorbent while heating to remove adsorbed water and air.…
Desorption of analyte gas samples from molecular sieve by heating in an oven and flowing helium gas through the adsorbent to flush the sample out.…
789-B Repave Driveway…
Repair and seal the south wall of 713-3N.…
This covers non-routine work for characterizing cooling water samples from 241-17F and 241-49H pump houses.…