Premix Air Blender No 2 Dust Collector (Z-205000-BMH-DCOL-0005) is in need of repair due to brief pressure excursion during normal operation.…
Perform cleaning, seal coating, and restriping of parking lots in A-Area, B-Area, C-Area, and N-Area.…
The existing Liquid Nitrogen delivery system for 735-A lab D-007 has failed due to age and deterioration. This work will include replacement of the…
Six degraded trailers SRS-PB-01030, SRS-PB-01032 (776-12A), SRS-PB-01033 (776-13A), 774-23A, 774-4A, and 774-5A known to contain asbestos containin…
Thermal Cycle Absorption Process (TCAP) Product Bed C is to be replaced by new components.…
Utilization and modification of 706-3F, 2nd floor to perform engineering classified computing task to support NNSA missions.…
New D3 consoles will be added to TEF and HANM facilities.…
Remove and Replace Door 1002, L-Reactor Building Personnel Wing to improve closing and locking of door.…
Extend breakroom on south side of Bldg. 717-8N.…
This task involves cleaning and packaging of stainless steel tubing and similar components.…