Install indoor PA speakers per attached work instructions in 703-A,784-3A, 784-1A, 703-46A, 703-45A, 723-A, 773-52A, 703-43A, 703-42A, 737-24A, 730…
Installation of electric vehicle charging stations across SRS.…
Install a pressure reducing valve in both Inert Load Lines in accessible locations that allow the operator to monitor delivery gas pressure and loa…
Subcontractor will perform a core sampling of roofs Buildings 232-H, 264-H, and 264-2H with the SRS asbestos group. Sampling locations will be patc…
Installation and Operation of LM-1 Degausser and DX-8 Destruction device for fast destruction of hard drives in Building 226-F. …
Renovations to High Bay Rooms in Training Support Building 766-H and Installation and Maintenance of equipment for use by SRPPF Training.…
The scope of this task will replace the diesel engine and generator and consolidate and/or replace the existing 4 Motor Control Centers (MCCs) in B…
The Tritium facility has requested that the Security Inspections Operations Area (SIOA) and examination room in 701-3H be converted into an office …
Replace degrading temporary structures at 226-F Truck Unloading Dock area with engineered drainage system and piping that will reroute rainwater to…
Replace Nitrogen Pressure Safety Valves (PSV's) per preventive maintenance work packages.…