Replace the Modicon Quantum PLC with an Emerson DeltaV Safety Instrumented System with Electronic Marshalling.…
To continue to meet the surveillance mission while developing new systems, the installation of the vibration machine in 248-H is imperative and sho…
This activity is for completion of Safe Shutdown thru Phase 1 Deactivation of 237-H/238-H/238-1H facilities. Although individual building numbers, …
This proposed activity includes the installation of a new SAS storage bed and replacing the existing Carbon Steel Nitrogen Exhaust Line for the SAS…
The once-thru AHU and exhaust system for the Inert Loading Facility (rooms 324 and 325) shall be replaced with an equivalent system that is more re…
We will live-trap raccoons and opossums at (30) study sites across SRS to study the factors affecting rabies elimination.…
The objective of this project is to evaluate the ecology of wildlife-vehicle interactions with respect to human perception, animal perception and b…
This activity will investigate the dissolution rate kinetics of metal oxides, with a particular focus on lanthanide oxides, in an organic solutions…
NNSA will be using the SEM 0202 (Serial No. 71-1216) shredder that they borrowed from Centerra at 713-N.…
703-43A Replace carpet and paint.…