To install permanent covers for the 735-22A Cylinder Storage Area for the hydrogen and propane gas delivery systems.…
      Remote interlock is to be added to the Salt Solution Receipt Tank Process Vessel Vent Heater Controller.…
      Installation of a double-wide trailer in E-Area. This revision includes the installation of a sidewalk along building 704-75E.…
      This modification will replace E3S in K-Area with the Lawrence-Livermore National Laboratory (LLNL) Argus Security System.…
      Testing of a 3D printed coalescer designed to aid in the separation of elemental mercury from the offgas/condensate stream of a chemical processing…
      Additional K-Area Storage Building Beautification and Enhancements, Rooms 1029 and 1003.…
      This EEC covers various general renovations for Building 773-A D-wing. Scope includes D
      Remove weeds via pulling, cutting, clipping in the K-Area Sand Filter and Settler Tank Area. This is currently an inactive contamination area (CA).…
      Repaint/Restripe K-Area Main Parking Lot outside of the Limited Area entrance.…
      FBI evidence examination and handling training using F-18 or La-140.…