Scope-Replace Pump Motors, Wiring, and Pipe Nipple at 715-3N…
Proposed activity is Work Order 1814974, 73E Repair-Replace Door Frame for E-055 Entrance, which will repair or replace the door and door frame bet…
Two vessels (TK 7.5 and TK 17.3) will need to be configured with a new SpG transmitter and a new liquid level-SpG jumper.…
Seeds of native plants will be placed in the field and monitored for several years for germination.…
Install new sprinkler heads (or relocate existing ones, if possible) throughout Building 704-71S where missing and adjust existing sprinkler head l…
Replacement of 704-Z Fire Alarm Panel due to it being obsolete.…
A second lead melter (1,000 lb) will be installed and operated at the Complex.…
The proposed modification is to remove two abandoned Kanne Chambers that are Out-of-Service (OOS) in Lab C-061 per M-DCF-A-01422.…
Remove concrete and metal post to a minimum of 2 inches below grade prep area and apply asphalt to restore the area back to its normal configuratio…
In-well sensor will be installed in an existing groundwater piezometer well in the F-Area wetlands. Monitoring will be performed remotely.…