The Saltstone Dust Collectors are to be equipped with pressure relief protection.…
Install Asphalt Paving for Additional Pads and Sidewalks in Z-Area to the northwest of 210-Z.…
Remove abandoned 115KV lines at SRS, including all wire, poles, hardware, and anchors.…
Installation of blanks between existing flanges downstream of valve 171-7 and 171-8.…
Blanks will be installed downstream on the outlet valves of third level head tanks (12A, 12B, 13B, and 13C) to prevent solvent from leaking through…
A-786005-HVAC-ACU-1 and A-786005-HVAC-ACU-2 are scheduled for replacement due to age and degradation.…
Final Deactivation and Decommissioning (D and D) of buildings: 483-3D, 484-5D, 484-9D, 485-D, 607-2D, 607-7D, 607-12D, 607-14D, 607-15D, Coal Handl…
Install four (4) monitoring wells and ten (10) soil borings in D-Area.…
The modification converts the Type IV waste tank high liquid level conductivity probe alarm circuits from Safety Significant to Safety Class.…
This EEC cover the Project design and Procurment of a new 13.8 kV Unit Substation to be situated near the existing 233-H Supply Fan Air Handling Un…