Analytical Sample Preparation Laboratory CX(s) Applied: B3.6 Date: 07/18/2013 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Building 4 Ventilation Upgrades CX(s) Applied: B2.1, B2.5 Date: 07/17/2013 Location(s): Oregon Offices(s): National Energy Technology Laboratory
McNary Substation Shunt Capacitor Addition CX(s) Applied: B4.6 Date: 07/17/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Mariah Wind CX(s) Applied: B1.7 Date: 07/03/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Umatilla Electric Cooperative CX(s) Applied: B4.9 Date: 07/03/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
South Yamhill Floodplain Property Funding CX(s) Applied: B1.25 Date: 06/26/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Big Eddy-Redmond Conductor Maintenance CX(s) Applied: B1.3 Date: 06/24/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Hat Rock Switching Station Replacement Project CX(s) Applied: B4.6 Date: 06/17/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Alvey Substation 115-kilovolt and 230-kV Breaker Replacement Project CX(s) Applied: B4.6 Date: 06/14/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Pilot Butte-La Pine #1 Wood Pole Replacements CX(s) Applied: B1.3 Date: 06/13/2013 Location(s): Oregon Offices(s): Bonneville Power Administration