Eugene Substation Protective Relay Installation CX(s) Applied: B1.7 Date: 01/29/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Provision of Funds to Acquire a Conservation Easement Over the 310-acre Coyote Creek property. CX(s) Applied: B1.25 Date: 01/23/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Building 4 Drain Line Replacement CX(s) Applied: B1.3, B1.15, B1.31 Date: 01/08/2013 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Rogue-Gold Beach No. 2 Disconnect Switch Replacement CX(s) Applied: B4.6 Date: 01/08/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Wave Energy Technology- New Zealand Multi-Mode Wave Energy Converter Advancement Project CX(s) Applied: A9 Date: 01/08/2013 Location(s): Hawaii, Oregon Offices(s): Golden Field Office
Pacific Northwest National Laboratory- Non-Wire Methods for Transmission Congestion Management Through Predictive Simulation and Optimization CX(s) Applied: B3.6 Date: 01/03/2013 Location(s): Washington, North Carolina, Illinois, Oregon Offices(s): Ad...
Bertelsen Substation Metering Panel Segment Addition CX(s) Applied: B1.7 Date: 12/31/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Tualatin Valley Water District Waterline Land Use Review Request CX(s) Applied: B4.9 Date: 12/31/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Sale of Lakeside Radio Station CX(s) Applied: B1.24 Date: 12/27/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Direct Drive Wave Energy Buoy CX(s) Applied: A9, B3.6 Date: 12/19/2012 Location(s): Oregon Offices(s): Golden Field Office