Severe Environment Corrosion and Erosion Research Facility CX(s) Applied: B3.6 Date: 02/22/2012 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Wind-Profiling Radar Installations in Oregon and Washington
Pearl Substation 500-Kilovolt #6 Bay Addition CX(s) Applied: B4.6 Date: 02/13/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Upgrade of the Existing Septic System at the Redmond Substation and Maintenance Facility CX(s) Applied: B4.6 Date: 02/08/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Upgrade of the Existing Septic System at the Big Eddy Substation and Maintenance Facility CX(s) Applied: B4.6 Date: 02/07/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Grant Consumer Power, Incorporated's Request for use of Right-of-way at Harrisburg Substation CX(s) Applied: B4.9 Date: 02/06/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Integration of the Farm Power Misty Meadows Generating Facility CX(s) Applied: B1.7 Date: 01/11/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Gas Chromatography CX(s) Applied: B3.6 Date: 12/29/2011 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Optimized Ports Assessment CX(s) Applied: A9, A11 Date: 12/20/2011 Location(s): Oregon Offices(s): Golden Field Office