Novel Engineered Osmosis Technology: A Comprehensive Approach to Treatment & Reuse of Produced Water CX(s) Applied: B3.6 Date: 12/20/2011 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Transforming Photovoltaic Installations Toward Discpatchable, Schedulable Energy Solutions CX(s) Applied: A9, B3.6 Date: 12/14/2011 Location(s): Oregon Offices(s): Golden Field Office
Modification of Metering Systems in Canby, Oregon CX(s) Applied: B1.7 Date: 12/02/2011 Location(s): Oregon Offices(s): Bonneville Power Administration
Integration of the Farm Power Tillamook Generating Facility CX(s) Applied: B1.7 Date: 12/02/2011 Location(s): Oregon Offices(s): Bonneville Power Administration
Integration of the University of Oregon’s Cogeneration Project CX(s) Applied: B1.7 Date: 12/01/2011 Location(s): Oregon Offices(s): Bonneville Power Administration
Transition the Umatilla Coho Production Program to a Local Broodstock Program CX(s) Applied: B1.20 Date: 12/01/2011 Location(s): Oregon Offices(s): Bonneville Power Administration
Grant New Cingular Wireless’ request for use of right-of-way at the Salem Substation CX(s) Applied: B4.9 Date: 12/01/2011 Location(s): Oregon Offices(s): Bonneville Power Administration
Ashe-Marion #2 Spacer Replacements CX(s) Applied: B1.3 Date: 11/29/2011 Location(s): Oregon, Oregon, Washington, Oregon, Oregon Offices(s): Bonneville Power Administration
Integration of the Green Lane Energy Biogas Generator CX(s) Applied: B1.7 Date: 11/17/2011 Location(s): Oregon Offices(s): Bonneville Power Administration
National Marine Renewable Energy CenterCX(s) Applied: A9Date: 10/18/2011Location(s): OregonOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office