Integration of the Farm Power Tillamook Generating Facility CX(s) Applied: B1.7 Date: 12/02/2011 Location(s): Oregon Offices(s): Bonneville Power Administration
Integration of the University of Oregon’s Cogeneration Project CX(s) Applied: B1.7 Date: 12/01/2011 Location(s): Oregon Offices(s): Bonneville Power Administration
Transition the Umatilla Coho Production Program to a Local Broodstock Program CX(s) Applied: B1.20 Date: 12/01/2011 Location(s): Oregon Offices(s): Bonneville Power Administration
Grant New Cingular Wireless’ request for use of right-of-way at the Salem Substation CX(s) Applied: B4.9 Date: 12/01/2011 Location(s): Oregon Offices(s): Bonneville Power Administration
Ashe-Marion #2 Spacer Replacements CX(s) Applied: B1.3 Date: 11/29/2011 Location(s): Oregon, Oregon, Washington, Oregon, Oregon Offices(s): Bonneville Power Administration
Integration of the Green Lane Energy Biogas Generator CX(s) Applied: B1.7 Date: 11/17/2011 Location(s): Oregon Offices(s): Bonneville Power Administration
National Marine Renewable Energy CenterCX(s) Applied: A9Date: 10/18/2011Location(s): OregonOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office
State Energy Program American Recovery and Reinvestment Act - Deployment of Innovative Energy Efficiency and Renewable Energy - Agriculture - Olson-Ashbrook-Schanno-Uhalde-Zoller ProjectsCX(s) Applied: B5.1Date: 10/17/2011Location(s): OregonOffice(s): ...
Feed Preparation and ComminutionCX(s) Applied: B3.6Date: 10/13/2011Location(s): Albany, OregonOffice(s): Fossil Energy, National Energy Technology Laboratory
Line and Load Interconnection of Coos-Curry Electric Cooperative?s New Substation to Bonneville Power Administration?s Fairview-Bandon 115-Kilovolt Transmission LineCX(s) Applied: B4.6, B4.10Date: 09/26/2011Location(s): Coos County, OregonOffice(s): Bo...